Nairaland Forum / Nairaland / General / Properties / The Total Cost Of Building The House You Want. (61844 Views)
If You Have Wall Gecko In Your House, You Need To Know This, They Can Kill You / Estimate Of Building Not So Fancy 3-bedroom Flat / The Total Cost Of Building Twin 5bedroom Duplex In Ibadan.... (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (14) (Reply) (Go Down)
Re: The Total Cost Of Building The House You Want. by Tammynator(m): 8:13am On Aug 18, 2018 |
God, please, bless me. Because of poverty, I dey always talk say I no like upstairs. But, seeing these mansions, who wouldn't love to live in them? Well, I'm waiting for 3 bedroom and 4 bedroom from Oga spyder. 3 bedroom duplex na still my level too for now. 3 Likes |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 11:22am On Aug 18, 2018 |
Tammynator: God must bless you, I can feel it from here. 12 Likes |
Re: The Total Cost Of Building The House You Want. by educhigo: 12:00pm On Aug 18, 2018 |
please urgent answer needed,can i use stone for lintel and pillars in a bungalow? |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 12:15pm On Aug 18, 2018 |
educhigo: What type of stone, any samples? 1 Like |
Re: The Total Cost Of Building The House You Want. by educhigo: 12:20pm On Aug 18, 2018 |
no i dont have the sample of the stone just normal stone |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 12:23pm On Aug 18, 2018 |
educhigo: I had wanted to see the samples, most aggregates used for building houses are stones, there is brown stones white (roundish) rock pebbles washed gravel granite chippings which are you talking about. 2 Likes |
Re: The Total Cost Of Building The House You Want. by Tammynator(m): 10:31am On Aug 19, 2018 |
spyder880:Amen! Thank you. 1 Like |
Re: The Total Cost Of Building The House You Want. by Danirose007(m): 10:56am On Aug 19, 2018 |
Eagerly waiting for 2bedroom bungalow, And 3 bedroom bungalow! spec's!! 1 Like 1 Share |
Re: The Total Cost Of Building The House You Want. by samoney: 11:27am On Aug 19, 2018 |
wow would following ur thread closely. |
Re: The Total Cost Of Building The House You Want. by Skyyoyo: 11:42am On Aug 19, 2018 |
Will be anxiously waiting for 40 -50 rooms students hostel and 4 bedroom duplex. Thanks. 1 Like 1 Share |
Re: The Total Cost Of Building The House You Want. by educhigo: 1:30pm On Aug 19, 2018 |
thanks for the good answer actually i base in china the first engineer i give the work have use the stone do the first flat and second flat, but still remain 3flat before he abandon the work,another engineer i give the work said that he cannot use the same stone for remaining lintel and pillar curve,asking me to buy weliweli i am confuse which one be weliweli again 2 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:30am On Aug 20, 2018 |
DUPLEX TYPE 12 (2 Lounge, 4 Bedrooms) Ground floor 1 front porch/terrace 1 Main lounge 1 Dining room 1 En suite guest bedroom 1 Visitors W/C 1 kitchen 1 kitchen store 1 lobby First floor 1 En suite master bedroom with walk in closet 2 En suite bedrooms 1 family lounge 1 study room 1 front terrace COST. Construction cost for building this house from land cleaning, foundation till roofing with stone coated roofing tiles, and finish of this house with top range materials, screeding, all paintings and industrial cleanings till turn key level is estimated to be about N43.7m. CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 8 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:31am On Aug 20, 2018 |
Duplex 13 Total cost of building this house will be N48.5m Terms and conditions apply. 2 Likes 1 Share
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:31am On Aug 20, 2018 |
Duplex 14 (Twin Duplex) N70m 3 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:31am On Aug 20, 2018 |
Duplex 15 (With pent floor) 1 Like
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:33am On Aug 20, 2018 |
BLOCK OF 6 FLATS OF 2 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 2 En suite bedrooms, with wardrobes 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N50m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 6 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:34am On Aug 20, 2018 |
BLOCK OF 8 FLATS OF 2 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 2 En suite bedrooms, with wardrobes 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N60m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 3 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:36am On Aug 20, 2018 |
BLOCK OF 10 FLATS OF 2 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas ( One in front of the living room and one at the back, backing the dining room? 1 Kitchen 2 En suite bedrooms, with wardrobes 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N70m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 3 Likes 1 Share
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 10:37am On Aug 20, 2018 |
Block of 4 flats of 2 bedrooms 2 Likes |
Re: The Total Cost Of Building The House You Want. by FADEO: 7:51pm On Aug 20, 2018 |
Skyyoyo: Same thing I am waiting for. Spyder where art thou nah? Knowest thou not that thine people and congregation waiteth on thee? 2 Likes |
Re: The Total Cost Of Building The House You Want. by uwa1(m): 9:16pm On Aug 20, 2018 |
FADEO: Yes oh... Cos meself don tire....
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:33am On Aug 21, 2018 |
Block of 2 flats of 3 bedrooms (Ground floor) 1 Like |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:33am On Aug 21, 2018 |
BLOCK OF 4 FLATS OF 3 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 3 Bedrooms, (one of them is a masters bedroom, en suite with wardrobe 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N47m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 1 Like |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:34am On Aug 21, 2018 |
BLOCK OF 6 FLATS OF 3 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 3 Bedrooms, (one of them is a masters bedroom, en suite with wardrobe 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N58m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 2 Likes |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:35am On Aug 21, 2018 |
BLOCK OF 8 FLATS OF 3 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 3 Bedrooms, (one of them is a masters bedroom, en suite with wardrobe 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N60.5m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 1 Like 1 Share |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:35am On Aug 21, 2018 |
BLOCK OF 10 FLATS OF 3 BEDROOMS Each flat will have; 1 Living room 1 Dining room 1 Visitors W/C 2 Verandas (One in front of the living room and one at the back, backing the dining room) 1 Kitchen 3 Bedrooms, (one of them is a masters bedroom, en suite with wardrobe 1 Central lobby Construction conditions include the start of a the foundation till roofing is completed, all building materials, workmanship and supervision, with the following; 1. Plastering, dressing and window hoods 2. Parapet 3. aluminium roofing sheets 4. POP ceilings 5. Casement windows with burglars proof 6. Iron doors external and wooden internal doors with keys 7. All floors tiles 8. Bathroom/kitchen walls tiled till top window level 9. Plumbing pipes and sanitary wares 10. Soak away system 11. Electrical piping, wiring, electrical fittings 12. Internal and external paintings and industrial cleaning Total Cost - N80m. OTHER CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 2 Likes |
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:38am On Aug 21, 2018 |
Hostel apartment, 48 self contained rooms 2 Likes
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:41am On Aug 21, 2018 |
Hostel apartment, 60 self contained rooms 4 Likes 1 Share
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 6:44am On Aug 21, 2018 |
Hostel complex, 72 self contained rooms 1 Like
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 8:58am On Aug 24, 2018 |
4 BEDROOMS BUNGALOW This house will have the following; 1 Front porch 1 Living room 1 Dining room 1 Visitors W/C 1 Lobby 1 Kitchen (with veranda) 1 Kitchen store 4 En suite bedrooms with wardrobes 1 Balcony facing the side of the house COST. Construction cost for building this house from land cleaning, foundation till roofing with stone coated roofing tiles, and finish of this house with top range materials, screeding, POP ceilings all paintings and industrial cleanings till turn key level is estimated to be about N21m CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 15 Likes 2 Shares
|
Re: The Total Cost Of Building The House You Want. by spyder880(m): 9:02am On Aug 24, 2018 |
3 BEDROOMS BUNGALOW This house will have the following; 1 Front porch 1 Living room 1 Dining room 1 Visitors W/C 1 Lobby 1 Kitchen (with veranda) 1 Kitchen store 4 En suite bedrooms with wardrobes 1 Balcony facing the side of the house COST. Construction cost for building this house from land cleaning, foundation till roofing with stone coated roofing tiles, and finish of this house with top range materials, screeding, POP ceilings all paintings and industrial cleanings till turn key level is estimated to be about N20m CONDITIONS. There might be need for a cost review if the land requires additional work on the foundation, but this will depend on the extent of work needed. Each situation will be considered on a case by case basis, and the final cost agreed. There might also be situations that can bring about a reduction in the cost of building this house, but only after an on-site inspection. This costing does not include the fence or compound works as we don't have your size of land now. 6 Likes
|
Re: The Total Cost Of Building The House You Want. by egbabiekperemo1: 2:01pm On Aug 24, 2018 |
spyder880: What s d cost of this one in a 70percent dry and 30 percent water logged land 1 Like 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (14) (Reply)
Hidden Secrets Of Borehole Drilling, Geo-physical Survey, Water Treatment Etc. / Parapet Roofing Support Building In Ebonyi State / Elegant 3 Bedroom Bungalow Construction On Half Plot - Lekki (with Pictures)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 57 |