Know About Geophysical Investigation For Borehole Drilling and others - Properties (11) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Know About Geophysical Investigation For Borehole Drilling and others (30112 Views)

Geotechincal / Geophysical Investigation,soil Test,pile Foundation,borehole Nig. / Neighbours Fight In Akwa-Ibom Because Of N300 Borehole Levy (photos) / Immediate Need For Borehole In Elebu, Ibadan (2) (3) (4)

(1) (2) (3) ... (8) (9) (10) (11) (12) (13) (14) (Reply) (Go Down)

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 11:46am On Jun 30, 2018
Have a great weekend wink
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 8:18pm On Jul 05, 2018
cheesy

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 6:20am On Jul 09, 2018
Screens

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 7:31pm On Jul 15, 2018
Geophysical survey at Akahia, Ekpoma

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 2:31pm On Jul 21, 2018
Have a great weekend
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 12:45pm On Sep 02, 2018
Happy New month
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 2:50pm On Sep 02, 2018
Hello ajibike440
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 9:47am On Sep 09, 2018
smiley
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 5:06pm On Nov 16, 2018
Hello wink
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 9:36pm On Nov 30, 2018
Hi family, have been receiving requests to write on handpump borehole. So watchout this space for daily pictorial steps in making a handpump borehole.
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 1:08pm On Dec 02, 2018
Larwin:
Hi family, have been receiving requests to write on handpump borehole. So watchout this space for daily pictorial steps in making a handpump borehole.

In constructing a handpump borehole, the first step as usual in any borehole drilling project is to conduct a geophysical survey first.

The geophysical investigation should be focused at getting a suitable point where good aquifer can be hit at a shallow or medium depth. Usually below 50m (165ft).

The installation should not go to a depth more than 30m (99ft) for it to be very effective with minimal jacking

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 5:57pm On Dec 02, 2018
cheesy
Re: Know About Geophysical Investigation For Borehole Drilling and others by fizzle231: 3:33pm On Dec 04, 2018
Larwin:
cheesy

Hello,

I am looking to drill a borehole in an area in Lagos, Magodo Shangisha to be precise.
Kindly send me needed info on pre-cost and actual cost or any other information via email or whatsapp

QX.solutions@yahoo.co.uk
08098349953 (WhatsApp)
Looking forward

Stay blessed
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 7:50am On Dec 07, 2018
fizzle231:


Hello,

I am looking to drill a borehole in an area in Lagos, Magodo Shangisha to be precise.
Kindly send me needed info on pre-cost and actual cost or any other information via email or whatsapp

QX.solutions@yahoo.co.uk
08098349953 (WhatsApp)
Looking forward

Stay blessed

OK, i ll message you now. Thanks
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 9:47am On Dec 07, 2018
Larwin:


In constructing a handpump borehole, the first step as usual in any borehole drilling project is to conduct a geophysical survey first.

The geophysical investigation should be focused at getting a suitable point where good aquifer can be hit at a shallow or medium depth. Usually below 50m (165ft).

The installation should not go to a depth more than 30m (99ft) for it to be very effective with minimal jacking


After the geophysical investigation, the best point is drilled. The drilling should be properly completed and flushed with compressor or pumped out with Ac pump. To make the water clean on time.

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 12:13pm On Dec 08, 2018
Larwin:



After the geophysical investigation, the best point is drilled. The drilling should be properly completed and flushed with compressor or pumped out with Ac pump. To make the water clean on time.

Now you ve your completed borehole, let's take you through the processes of installation.
1) Borehole
2) Connecting rods and Pipes
3) Plunger from the pump (bushing)
4) The legs

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 9:58am On Dec 10, 2018
Larwin:


Now you ve your completed borehole, let's take you through the processes of installation.
1) Borehole
2) Connecting rods and Pipes
3) Plunger from the pump (bushing)
4) The legs

1) A Ditch is made round the borehole for casting of the legs
2) The leg is placed inside the ditch and properly levelled
3) The levelled leg is casted using granites, sand and cement.

After casting, it ll be allowed to stay for like 4 days to dry up before installation continues.

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 7:22am On Dec 12, 2018
Larwin:


1) A Ditch is made round the borehole for casting of the legs
2) The leg is placed inside the ditch and properly levelled
3) The levelled leg is casted using granites, sand and cement.

After casting, it ll be allowed to stay for like 4 days to dry up before installation continues.


The Plunger is tightened well to the bushing to prevent leakages so as to have a better pressure.

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 9:21pm On Dec 14, 2018
Larwin:



The Plunger is tightened well to the bushing to prevent leakages so as to have a better pressure.

After the casting must have dried up, the next step is the installation proper.
1) Dried casted hole
2) Connect the casing to the pump and lower inside the hole
3) Connect casing to casing while lowering
4) Connect the head output to the casing and lower

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 12:05pm On Dec 19, 2018
Larwin:


After the casting must have dried up, the next step is the installation proper.
1) Dried casted hole
2) Connect the casing to the pump and lower inside the hole
3) Connect casing to casing while lowering
4) Connect the head output to the casing and lower

Installation continues.....
1) The connecting rods are connected together
2) The connecting rods are lowered into the borehole
3) The plunging chain is set with the well head in a manner to produce a maximum jacking
4) The chain is fastened to the connecting rod after the plate has been put in place
5,6) The chain is fastened to the well head (jacking hand)
7) The borehole is fully ready to serve with full pressure

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 12:10pm On Dec 19, 2018
Larwin:


Installation continues.....
1) The connecting rods are connected together
2) The connecting rods are lowered into the borehole
3) The plunging chain is set with the well head in a manner to produce a maximum jacking
4) The chain is fastened to the connecting rod after the plate has been put in place
5,6) The chain is fastened to the well head (jacking hand)
7) The borehole is fully ready to serve with full pressure

Cont.

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 7:03pm On Jan 09, 2019
Ibadan kí ní sò cheesy

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 8:42am On Jan 28, 2019
Happy new week
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 8:09am On Feb 02, 2019
smiley
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 8:19am On Feb 04, 2019
Happy new week guys
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 1:42pm On Feb 04, 2019
smileywho needs a water stanchion wink

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 12:57pm On Feb 07, 2019
wink

Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 7:05pm On Feb 08, 2019
smiley
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 1:48pm On Feb 09, 2019
lipsrsealed
Re: Know About Geophysical Investigation For Borehole Drilling and others by Larwin(m): 1:23pm On Feb 15, 2019
sad

(1) (2) (3) ... (8) (9) (10) (11) (12) (13) (14) (Reply)

Cheapest Places To Live In Lagos For NYSC Corpers / Top 6 Reasons Why Real Estate In Banana Island Is The Most Expensive When Compar / Emeka Offor Donates 10 Houses To Widows In Anambra

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 61
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.