Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:06am On May 14, 2022 |
Hello my good people, we gather here again to do another beautiful work. We have been hired to renovate a couple of flats to modern standards. These flats were built in the 1980s but still looking good. However, the owners wants the flats touched up so they can conform to modern standards. No fancy finish styles, no expensive materials to be used, just get the building to today's standards. Details of the work; Project: Renovation of two flats Location: Anambra state, Nigeria Client: A Nairalander Contractors: Spyder880 builders Duration: 30 days Please follow me as we move to make this project a huge success. We thank you all. 2 Likes 1 Share |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:06am On May 14, 2022 |
Our first task will be to remove all the old tiles in the flats, like I said, the conditions of this house is still very much okay, but just to make things come up to today's standards.
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:15am On May 14, 2022 |
We also plan to remove the bath, change it with a shower unit and change the W/C units to new ones. The wall tiles will also be changed. 1 Share
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:21am On May 14, 2022 |
We might not change these designed doors because they are still in good conditions, they only need some touches, painting, change of keys and general repairs........... The wall tiles in the bathrooms will be changed, the piping for water and waste redone to modern standards, hiding all the pipes inside the walls. We also plan a full floor to ceiling tiling work.
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:35am On May 14, 2022 |
The electrical wiring in these flats were the surface wiring method, with tumbler switches. We intend to work on the walls to remove all the wires, and change this system to a conduit piping system. Note that all the electrical components in this house are still very functional, despite working for nearly 40 years. We just need modern switches, sockets, light fittings and bulbs.
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:40am On May 14, 2022 |
Tiles removal in progress........ 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:44am On May 14, 2022 |
More rooms with tiles removed....... 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 5:47am On May 14, 2022 |
Removal of the baths, old pipes and wash hand basins..........
|
Re: Renovation Process Of 2 Flats In Anambra State by kenelink11: 9:07pm On May 14, 2022 |
My dear Brother, am Kenechukwu Nnoli and I recently graduated from civil Engineering in unizik. I will love to be your disciple. |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 9:41pm On May 14, 2022 |
kenelink11: Good evening my brother. Nice to know you. |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 11:26am On May 15, 2022 |
Drilling holes in walls to bury electrical piping and re -lay the wires into the walls. Work in progress 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 12:03pm On May 15, 2022 |
Plumbing piping works 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 12:09pm On May 15, 2022 |
Still bringing in more materials...........
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:53am On May 20, 2022 |
Sealing the cracked walls, wall corrections......... 2 Likes
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:56am On May 20, 2022 |
Sealing......... 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by tivta(m): 11:20am On May 20, 2022 |
My oga well done oh. Abeg quick question, like how much will be needed for a 2bedroom bq with sitting room, kitchen and 2baths? With titles in all rooms, roof etc . Just a rough estimate. Within the outskirts of Awka town. |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 3:24pm On May 20, 2022 |
tivta: Do you have a sample building plan, or a sketch for it? |
Re: Renovation Process Of 2 Flats In Anambra State by tivta(m): 5:02pm On May 21, 2022 |
spyder880:
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 6:42pm On May 21, 2022 |
[quote author=tivta post=113043766][/quote] Although I dont have the complete size of this house, budget about N4.5m for this house. Things are so costly in the market these days. |
Re: Renovation Process Of 2 Flats In Anambra State by tivta(m): 8:48pm On May 21, 2022 |
spyder880:Thanks so much for the insight. God willing we shall work together. 1 Like |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 11:25am On May 29, 2022 |
Sealed and ready.......
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 11:28am On May 29, 2022 |
Rough plastering works on the bathrooms before tiles application...........
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 11:37am On May 29, 2022 |
Start of POP ceiling redjustments
|
Re: Renovation Process Of 2 Flats In Anambra State by TopazandDiamond: 6:57pm On May 29, 2022 |
spyder880:Can this type of renovation be done while people are still living in the property? |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:04pm On May 29, 2022 |
TopazandDiamond: Yes, but the occupants will.have to move to a room or two while the work is ongoing. |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 8:17pm On Jun 05, 2022 |
Our work here was delayed seriously last week due to some unforeseen circumstances. But we are back on track now. |
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 8:19pm On Jun 05, 2022 |
We have had to buy a roll of electrical wires and rewire this house, our target now is to provide air conditioning options, water heater options and other modern day fittings that were not included in this building as at the time it was constructed..........
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 8:24pm On Jun 05, 2022 |
We have been producing ceiling boards for our use in this house, actual ceiling works started today.......... 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:41am On Jun 10, 2022 |
We have started wall tiles in these flats....... 2 Likes
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:46am On Jun 10, 2022 |
Production and installation of POP ceiling boards.......... 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by spyder880(m): 7:48am On Jun 10, 2022 |
More ceiling space covered......... 1 Like
|
Re: Renovation Process Of 2 Flats In Anambra State by Kingdemu: 9:32am On Jun 10, 2022 |
Following 1 Like |
Medorf Elegant Estate ( Ilorin) / Sanitary Wares in Lagos: For Architects, Interior Designers and other Projects / 5 Bedroom Hot Hot detached Duplex For Sale Chevron Lekki Lagosrice:
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28 |