Zungeru Hydropower DAM In Niger State Completed / The 40MW Dadin Kowa Hydropower Project In Gombe (Photos) / Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 2:10pm On Dec 21, 2021
treesun:
How do we get to 25000MW by Siemens now!

The 25,000 Baker what is building dams in the middle of the desert. All the dams in the north of Nigeria generate less than 50% of capacity
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by History555: 2:12pm On Dec 21, 2021
theenchanter:
I'm not disputing d fact that coal power stations are still around, what I'm staying is that it has been agreed to be phased out and no new coal power plants will be built according to WEF.

But China claims to be building new coal plants with reduced emissions. The era where the west fools the world is over. Even us companies now trade in carbon derivatives and expect the rest of the world to take it serious

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 2:14pm On Dec 21, 2021
tsdarkside:


forget it....the corrupt distrubutors will sabotage it as as usual....
it was a bad idea to privatize that sector....

fg should have givin it to the nigerian army to manage....
nigerian army is the only institute that still works somehow....

the rest are just bunch of sick lunatics....
get rich quick has corrupted the ol system....

Nigerian army which cannot even make their own bullet which have destroyed the country DarkSide go and take a sleep
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 2:19pm On Dec 21, 2021
anyilalaz:
We keep on going from stupidity to mediocrity and back to front. All these project are cash cows were politicians loot the country. Most of these hydrodams are not utilized at optimum level more often during the drought and dry seasons. They hardly reach one-half its installed capacity even at highest water level.
All thses amount spent can be use to resuscitate the Oji River power plant in Enugu state and revamp it to up 6000MW capacity or perhaps build another one in Okaba, Ankpa Kogi State. These two areas has abundance deposit of coal.

Most of the powe stations in China, India, Pakistan etc run efficiently on coal with least capacity being around 5,000 MW.

But siting such gigantic project in the East is no no thing for the government because of their hatred for the region. Even the Kogi, being a minority. Below is some coal power plant in China..

Let me explain something to you what do you expect from a government which built dams in the middle of the Desert when there is no water in that place take mambilla station since 1980 Nigeria has been trying to build a dam on it only to find out year after year the water is not even there to feel the damn up talk less about to run the top by. The government just put infrastructure in the middle of the Desert and leaves them to rot.

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by tsdarkside(m): 2:20pm On Dec 21, 2021
SUFFERInSMILIIN:


Nigerian army which cannot even make their own bullet which have destroyed the country DarkSide go and take a sleep

who told you nigeria doesnt produce bullets....??
why you love lookin down on your own selfs soo much....??
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:22pm On Dec 21, 2021
treesun:


I know your type!

You don't know anything.
If there are abundant respectable jobs in Nigeria, nobody will stop you if you still want to cross desert to go and hiding in Europe as illegal alien
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by tsdarkside(m): 2:22pm On Dec 21, 2021
SUFFERInSMILIIN:


Let me explain something to you what do you expect from a government which built dams in the middle of the Desert when there is no water in that place take mambilla station since 1980 Nigeria has been trying to build a dam on it only to find out year after year the water is not even there to feel the damn up talk less about to run the top by. The government just put infrastructure in the middle of the Desert and leaves them to rot.

because they listen too much to foreighners....
why is ajaokuta still not workin till today....??
the same foreighners....

than to tell your people to stop listenin to foreighners,you are busy insultin them day and night....
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:23pm On Dec 21, 2021
Harrisonwo:
FG should remove power generation from the exclusive list. States should be allowed to generate their own power and the excess sold to the national grid.

Correct matured and sensible contribution to the discussion
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by treesun: 2:24pm On Dec 21, 2021
Ovamboland:


You don't know anything.
If there are abundant respectable jobs in Nigeria, nobody will stop you if you still want to cross desert to go and hiding in Europe as illegal alien
The problem is I dont need to cross desert, I have UK visa stamped at Sheffield!
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by lexy2014: 2:24pm On Dec 21, 2021
Ovamboland:


Oh Lord!

We have presently about 13,000mw available generation capacity out of which we can only transmit by grid and distribute only 4-5000mw max without suffering grid collapse.

The hydrodam project in this report will add almost 3000mw to make our total capacity for power generation to 16,000mw.

I didn't mean the entire 13,000mw we have today is idle

I get u. We are on d same page. Nigeria generates 13,000mw. From that amount, only 5,000mw can be transmitted and distributed leaving us a balance of idle 8,000mw. That means that any additional mw generated whether by dams or any other means is going to be idle and added to the already idle 8,000mw.

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:25pm On Dec 21, 2021
SUFFERInSMILIIN:


Even if Nigeria has a hundred times there will be no electricity the government built dams in the middle of the Desert where there is no water. Look at mambilla power station since the 1980s Nigeria has tried building this damn only for it to be reduced from 3,000 megawatts to less than 500 megawatts. And now at 500 m what there is still no water to fill the reservoir. This is the northern illiteracy if you look at Lake Chad Lake Chad is 80% empty from 20 years ago there is no water in the north of Nigeria we are still building dams in the North

Mambilla is in the desert?
Go and seek knowledge, you need your mind liberated
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by tsdarkside(m): 2:25pm On Dec 21, 2021
Ovamboland:


Correct matured and sensible contribution to the discussion

i think its the best solution too....each state should look for their own power production....
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by tsdarkside(m): 2:25pm On Dec 21, 2021
Ovamboland:


Mambilla is in the desert?
Go and seek knowledge, you need your mind liberated

he is like that....very negative guy....
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by lexy2014: 2:27pm On Dec 21, 2021
Ovamboland:


Exactly, now you are getting it. That's the main essence of the Siemens deal.

So that as Siemens is working on their own part of the system, we will be gradually increasing the 13,000mw available with the addition of 3000mw hydro, and other projects.

A time will come when we must start planning to increase the Siemens 25,000mw distribution capacity to 50,000mw so more investment can be attracted to the power generation sector.

Obasanjo $16b power investment focused on power generation sector with little attention paid to distribution.

That means Obasanjo didn't steal d entire $16b as alleged all along.

Your explanation is well understood and appreciated but d scepticism isn't misplaced because until the Siemens deal is achieved, no additional amount of power generated to the already existing 13,000mw will make any difference

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by tsdarkside(m): 2:28pm On Dec 21, 2021
lexy2014:


I get u. We are on d same page. Nigeria generates 13,000mw. From that amount, only 5,000mw can be transmitted and distributed leaving us a balance of idle 8,000mw. That means that any additional mw generated whether by dams or any other means is going to be idle and added to the remaining idle 8,000mw.

it will be idle....generate as much as you like....if you cant distribute it,then its senseless and waste of money....

nigeria should stop buildin new plants and concentrate on distribution....
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:30pm On Dec 21, 2021
treesun:

The problem is I dont need to cross desert, I have UK visa stamped at Sheffield!

Goodbye, thousands don't have that privilege, their option is desert.

With power available for industry and jobs created, those youths have better chance working and developing skills here. What skill will they learn sweeping roads and shoveling snow?
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:31pm On Dec 21, 2021
lexy2014:


I get u. We are on d same page. Nigeria generates 13,000mw. From that amount, only 5,000mw can be transmitted and distributed leaving us a balance of idle 8,000mw. That means that any additional mw generated whether by dams or any other means is going to be idle and added to the remaining idle 8,000mw.

Yes,
Hence the first priority is expanding our transmission and distribution capacity as planned under the Siemens deal
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:34pm On Dec 21, 2021
tsdarkside:


he is like that....very negative guy....

I guess he is not aware that river Niger that ends up in Niger Delta and generates power at Kainji and Jenna dams actually enters Nigeria through 'desert' Niger republic.
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by sulaak(m): 2:36pm On Dec 21, 2021
treesun:
How do we get to 25000MW by Siemens now!

According to news media, that deal has been cancelled.

There was an issue about local content by the Nigerian government, since the German government was providing the majority of the funds (like the Chinese deals) Siemen was reluctant to share 40% to local Nigerian organisations.

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by treesun: 2:36pm On Dec 21, 2021
Ovamboland:


Goodbye, thousands don't have that privilege, their option is desert.

With power available for industry and jobs created, those youths have better chance working and developing skills here. What skill will they learn sweeping roads and shoveling snow?

How many hours of light do you enjoy?
I have generator, solar and yet still cant enjoy serenity. Bad policies are making people run away. 60% of youth going abroad are not street sweepers, many of them are working in corporate oragnisation. Bitcoin distribution will have 3 Nigerians. Gone are they days, guys are getting good jobs in Asia, Uk, Canada, Australia, Beginning may be tough, but people are weathering the storm and happy after!
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by treesun: 2:37pm On Dec 21, 2021
sulaak:


According to news media, that deal has been cancelled.

There was an issue about local content by the Nigerian government, since the German government was providing the majority of the funds (like the Chinese deals) Siemen was reluctant to share 40% to local Nigerian organisations.

This is not true, FG said it will start in the second quarter!

1 Like

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:39pm On Dec 21, 2021
sulaak:


According to news media, that deal has been cancelled.

There was an issue about local content by the Nigerian government, since the German government was providing the majority of the funds (like the Chinese deals) Siemen was reluctant to share 40% to local Nigerian organisations.

I hope this is resolved as quickly as possible or otherwise we go with General Electric if they can have a better deal. This is very crucial to having a more stable economy.
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 2:44pm On Dec 21, 2021
treesun:


How many hours of light do you enjoy?
I have generator, solar and yet still cant enjoy serenity. Bad policies are making people run away. 60% of youth going abroad are not street sweepers, many of them are working in corporate oragnisation. Bitcoin distribution will have 3 Nigerians. Gone are they days, guys are getting good jobs in Asia, Uk, Canada, Australia, Beginning may be tough, but people are weathering the storm and happy after!

I can tell you for free that for every one tech guy getting job offer abroad, there are 5 guys whose only option is desert crossing.
Stable power will stimulate industry and jobs that will reduce such demeaning existence for our youths due to limited choices.

I'm not trying to stop anyone with genuine job offer from relocating.
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by treesun: 2:47pm On Dec 21, 2021
Ovamboland:


I can tell you for free that for every one tech guy getting job offer abroad, there are 5 guys whose only option is desert crossing.
Stable power will stimulate industry and jobs that will reduce such demeaning existence for our youths due to limited choices.

I'm not trying to stop anyone with genuine job offer from relocating.

What is stopping Fashola and Buahri and co that said, providing electricity is not a rocket science!
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Ovamboland(m): 3:02pm On Dec 21, 2021
treesun:


What is stopping Fashola and Buahri and co that said, providing electricity is not a rocket science!

They should be able to answer for themselves
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 3:40pm On Dec 21, 2021
tsdarkside:


because they listen too much to foreighners....
why is ajaokuta still not workin till today....??
the same foreighners....

than to tell your people to stop listenin to foreighners,you are busy insultin them day and night....


Get it through your head it is not working because of mismanagement who have you seen travel the steel Billet all the way to the North. Look at Ghana and what the foreigners did in their aluminium industry where the aluminium was mined that is where they built the industry. Nigeria's case where the steel Billet come from is about 250 km away from where Elijah Steel plant is. It is known as illiteracy. Nigeria's problem the people are stupid and illiterate they want a Nigerian to do everything at the Nigerian can do nothing just Like Them government
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 3:44pm On Dec 21, 2021
Ovamboland:


Mambilla is in the desert?
Go and seek knowledge, you need your mind liberated

You are very shallow minded and cannot reason what somebody is saying what I am trying to say is there is not enough of water in this area is that is why time and Memorial again the past stations have been set back. Big generation capacity of mambilla power station was supposed to be 5,000 megawatts but because of inadequate water it has been reduced to less than 800. The best areas in Nigeria in rainfall are in the south but we build the dams in the North. Chad basin is 80% empty all the rivers and lakes in the North are drying up and you are building dams in desert where there is not enough of water. The waterway is 1/4 of kanji Dam you can see in the picture the waterway is very small

Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by SUFFERInSMILIIN(m): 3:55pm On Dec 21, 2021
Ovamboland:


I hope this is resolved as quickly as possible or otherwise we go with General Electric if they can have a better deal. This is very crucial to having a more stable economy.

It's nothing to do with the foreign company but the Nigerian mentality. Look at United States of America when Nigerians went to vote for three senators stupidly the senators have no electricity in their Village they're at 88% of the youth in their Village are unemployed they are no Road in their Village this is how stupid Nigerian people are even in developed countries . American news channels like fox NBC and ABC network i know mickey documentaries of the nigerian centres in america no electricity new job nothing india villages sport nigeria's in voted.for damn how funny. The problem with Nigerians they will only follow an idiot which can do nothing for them then they were foreigners to develop them after they're voted for some Nigerian idiots that is Nigerian mentality
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by Jlow2: 4:16pm On Dec 21, 2021
Same story for the past 10yrs
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by 0taPiaPia(m): 4:16pm On Dec 21, 2021
Can't these mudafuckers build a 100k capacity power plant for pets sake... A country of 200million plus people.
Re: Nine Hydropower Projects To Add 2,672MW To National Grid – FG by nedzuby: 4:31pm On Dec 21, 2021
Alexpetra:
Buh buh... But I thought they said generating is not the problem but Distribution? This leaders no dey play the tape they give us before?? Who be the mumu abi their mumu never do??

Nigeria is currently generating 13000mw when you add this 3000mw it will be 16,000mw. At of the 13000mw we are only distributing less than 4000mw making about 9000mw idea. So yes it is the distribution that is the problem and that is why Nigeria contracted Seamen to come and increase our distribution to 25000mw to accommodate our 13000mw+3000mw and additional mw which is being worked on.

(1) (2) (3) (4) (Reply)

Obi's Credentials Have Always Been In The Open - LP / Lagos Rains: Women Protest Flooding In Lekki Area / Buhari Latest Photo - There He Stands...

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 61
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.