Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,197,775 members, 7,965,917 topics. Date: Friday, 04 October 2024 at 03:37 AM |
Nairaland Forum / Nairaland / General / Properties / Nexthome Builders: 2014/2015 New and Ongoing Projects (113536 Views)
Construction Journal | Browne Mews By Nexthome / Desmond Flats At Ogombo By Nexthome / PLOT 10AB HAVEN & THE RESERVE IN AGUNGI By NextHome (2) (3) (4)
(1) (2) (3) ... (31) (32) (33) (34) (35) (36) (37) ... (50) (Reply) (Go Down)
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Nobody: 9:26pm On Aug 27, 2015 |
mufutau55:yes sir, I dey here o those drink go wound man pikin sir |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Nobody: 9:29pm On Aug 27, 2015 |
3strike:boss u wan wound ekiti man abi? |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by mufutau55(m): 4:18am On Aug 28, 2015 |
adeekiti: Just pretend like you are drinking Emu (Palm-wine) like my in-laws always offer me at Ado-Ekiti. Hajji M. |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Nobody: 6:38am On Aug 28, 2015 |
mufutau55:sir oya make u host us o |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Dieumerci(m): 9:06pm On Aug 28, 2015 |
brabus: @Brabus, each time you keep moving on and moving on to more controversies. Don't you think something is wrong somewhere? 2 Likes |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Optionalx: 8:13am On Aug 29, 2015 |
mavverick:Please how much did buy ya planks and bamboo for decking and like how many will be used for a building of 27m by 12m from your experience. Thks |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 2:59pm On Aug 29, 2015 |
The Reserve by NextHome Inside
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 3:01pm On Aug 29, 2015 |
The Reserve by NextHome Out
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 6:17am On Aug 30, 2015 |
This Week 1. Work resumes at our Awoyaya Multi Dwelling Project Site 2. Work resumes at our Awoyaya Mixed Use Development Site 3. Finishing SquareOne 4. Slab work at Alpha Beach Many thanks to you guys for your understanding and patience. Pics: Awoyaya Mixed Use Development
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 8:56am On Aug 31, 2015 |
Slabwork | Alpha Beach
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 9:05am On Aug 31, 2015 |
Slabwork | Alpha Beach II
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 9:25am On Aug 31, 2015 |
Slabwork | Wraparound Terrace
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 11:37am On Aug 31, 2015 |
Awoyaya Mixed Use Development - Progress Pictures
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 11:48am On Aug 31, 2015 |
Awoyaya Mixed Use Development
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 11:57am On Aug 31, 2015 |
Awoyaya Mixed Use Development II
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 12:17pm On Aug 31, 2015 |
Awoyaya Mixed Use Development | Railings and Window Burglar Proof Installation
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 1:24pm On Aug 31, 2015 |
Awoyaya Mixed Use Development | Balcony Rails
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 5:27pm On Sep 03, 2015 |
SquareOne by NextHome
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:07am On Sep 04, 2015 |
Says ARINDIN! brag3: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:09am On Sep 04, 2015 |
You are just too dumb! 3strike: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:12am On Sep 04, 2015 |
Monkey too wanna to talk shey? successmatters: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:14am On Sep 04, 2015 |
I don't do jungle justice that y'all are known for, so I reason like someone with brains. brag3: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:16am On Sep 04, 2015 |
Oloriburuku! 3strike: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:17am On Sep 04, 2015 |
Trash surfer, were! beedam: |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 3:41am On Sep 04, 2015 |
@adeekiti, brag3, successmatters, 3strikes, Beedam and every person that called me brabus. may your loved ones weep over you this year if I am not brabus. You are just bunch of foolish individuals who have failed in life, and since you can't get to carry out your frustration by setting Maggi & pepper thieves in your neighborhood on fire jungle justice style, you have to bring yourselves here to vent your frustration. Foolish men, I pray the women in your lives twist and rip your joysticks and balls off in one piece. Awon were gbogbo! Awon oloshi, you all have failed and trying to play a catchup. None of you have been able to carry out a decent project, only noise you make on nairaland to cover up your failures and inadequacies. Shame on you. |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by wytecat: 4:00am On Sep 04, 2015 |
Sorry brabus for taking almost half of your page. I've been gone, but these half & weak men are still talking about me. |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by Nobody: 6:36am On Sep 04, 2015 |
As God liveth all u say will be your portion not any of us, Damn u must be out of your head wytecat: 1 Like |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 7:04am On Sep 04, 2015 |
Pre-works/Groundworks ongoing at Awoyaya Multi-Dwelling site Picture updates later on this thread. |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by sako28: 10:20am On Sep 04, 2015 |
wytecat: Mr Brabus or Wytecat, This is the peak of your insensitivity, i have followed all ur works from every end of the world. I have viewed ur works with top professionals from Latin America to Asia. But disappointed with this ur comment. Well wish u all the best in life, but u have lose a fan and my respect. will never follow ur tread again. Cheers. 1 Like |
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 10:33am On Sep 04, 2015 |
sako28: Sako28, Wytecat is not Brabus and has nothing to do with me. I've strongly condemn the inciteful statement and have used the report link to report this to the moderators. I was thinking they'll do the needful on their part. I don't see wytecat statement on my browser again. I'm surprised nothing has been done by the moderators.
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brabus(m): 12:11pm On Sep 04, 2015 |
The Reserve by NextHome
|
Re: Nexthome Builders: 2014/2015 New and Ongoing Projects by brag3: 3:10pm On Sep 04, 2015 |
Afternoon Brabus and fellow NL. I had promised myself not to talk about Brabus anymore but I feel way too aggrieved not to bring this to the public domain. I know talking to Brabus 1-on-1 won’t help so it’s best to mention this here so he can let me understand a few things. NL members are already aware of the earlier review on Brabus and I don’t need to dig up old dirt but I need to mention a few things that give me cause for concern. On October 13th 2014 Brabus was paid 220K for architectural designs. Brabus said this payment was for Architectural and Structural drawings. No issue here. On Nov 3rd 2014. Brabus was paid a further 187,000 naira. This was to cover what was termed amended approval. Please let me explain this. The land that we purchased already had an uncompleted building and this structure already had an approval for 4 * 3 bedroom Flats. Because we were changing this to 6*2 bedroom flats Brabus said that we will need to do some kind of amended approval so that the current approval could be transferred to the 6*2 bedroom flats. Brabus if I am wrong here then please state clearly exactly what the 187,000 was for. I will enclose a screenshot of the payment made which says “Money for Building Change Order Approval”. Having chased Brabus for a few weeks he now finally delivered what supposed to be my approved structural and Architectural drawings and my first take on them was that something was not right. I then passed them over to an architect to look over them and give me his thoughts and his comments were very damning. I will upload his comments shortly but in order to avoid hear-say I will attach the documents here so our Certified Architects and Engineers can comment on it. When my brother asked Bosun about this approval these were his responses which will be attached as screenshots “when he gets to Alausa he can do proper check on what he should do normailly for approval of such structure. They payment made was for the guys to clear up the way and not for a new approval. The old approval on the old drawing still works”. Brabus please can you explain what this means? NL members do you know what this means? So that’s on the approval which I can live with but what I cannot live with is when the drawings that we paid for do not reflect what has been done on ground. As you will see from the Screenshot, this shows about 33 pillars but having been onsite a lot of times I know that we have 49 pillars which is completely different from the drawings. Whilst I am sure that having more pillars is better than having less this does not excuse the fact that the drawings don’t reflect what we actually have. Since I don’t talk to Brabus I pushed this over to my brother and Brabus’ answers to this completely blew my mind. He may be able to pull the wool over my brother’s face but it does not wash with me. I have attached all the screenshots of the conversation sent to me last night and I will let Brabus respond to these. I find it disturbing to pay for drawings which are meant to be done by a certified architect and all we got is some quack job which even belittles a first year under-graduate. These documents have also been stamped. Brabus who stamped these documents? Was it a certified Architect and structural Engineer or this some fake stamp used here. Who was the architect? Please can you furnish his credentials as I feel I have the right to speak to him about the quality of this work. I have also been told that these are meant to have some engraved stamp and also signed by the Certified Architect and Structural Engineer. Where are these? Where is lagos state the coat of arms? Where are the structural calculations? Who is Leke Akanni? I just want Brabus to explain to me exactly what he has given to me. I find it very worrying that the drawing shows 33 pillars when infact we have 49 pillars. That’s a massive difference. When my brother asked Brabus about this his responses which I will also attach here are as follows: “We introduced more columns onsite” “We can’t rely on blocks supplied so I added more columns” “I had no choice than to buy blocks from Omo onile guy but his block are not solid so we added more columns for support at strategic angles of the building” “it would be an issue if there are 46 columns in the drawing and we only install 33” “I don’t know when adding more support to a house has become a problem” Can you imagine all this crap? Are you telling me that your architect could not figure out how many pillars were needed when you first went to the site to get information? He was out by about 16 pillars so are you telling me that it is acceptable to start adding pillars on the fly? I may not be an expert but you always get things done on paper properly before doing the main work. It is called proper design and it applies to most jobs we do not just building and engineering. Please tell me how does block affect pillars? I thought these pillars are casted so what do bad blocks have to do with you adding new columns. Engineers on site. Aventures, Segymore, lafolabli, Spyder and others please help me here. Do we use blocks when doing raft foundation and pillars? I have attached as many screenshots as possible. If Brabus needs more I have them. Please other NL members if you Brabus has done your approval for you please have these checked out asap as you may be holding on to some thrash thinking you have valid approval. Brabus I eagerly await your response to my questions.
|
(1) (2) (3) ... (31) (32) (33) (34) (35) (36) (37) ... (50) (Reply)
Femi Osibona: Face Behind Collapsed 21-storey Building In Ikoyi / 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) / Kitchen cabinets, Wardrobes & Doors @ Touchstone Design Solutions
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 49 |