Construction Of A Twin 2 Bedroom Bungalow In Ibadan - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of A Twin 2 Bedroom Bungalow In Ibadan (11507 Views)

Construction Of A Twin 4bd/rm Duplex @IBADAN By Dioritestructures / Building A Twin 2 Bedroom Flat / Invest Your Money Wisely 12 Room And 2 Twin 2 Bedroom For Sale In Ibadan (images (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 9:11pm On Jul 05, 2017
EgunMogaji:


No german floor?
the client said he doesn't have money for German floor .So there is nothing I can do .

3 Likes

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 11:27pm On Jul 05, 2017
tevanso:
the client said he doesn't have money for German floor .So there is nothing I can do .

what's the implication of his choice to the structure?

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 11:29pm On Jul 05, 2017
yak:


what's the implication of his choice to the structure?

An astute question.

I've seen only one professional builder that did this for a client on here and the structure was for a friend.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 11:39pm On Jul 05, 2017
yak:


what's the implication of his choice to the structure?
since its not a raft foundation it might not have any structural defect on it,the only issue here is that with time there will be capillary movement of water from the ground encroaching to the walls at the super structure where by leaving the walls damp .These is a major cause of flaking of paints at the lower part of buildings .It also gives room to insects and rodents to penetrate the ground floor of buildings that has no German floor. though I tried persuade him to do German floor even if its not more than 3 inches thickness he refused .Gave me instances of houses his friends and relations have built without German floor.

6 Likes

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 9:09am On Jul 06, 2017
can u mention the quantity of materials used so far for the foundation. block, cement, gravel and more

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 2:25pm On Jul 06, 2017
tevanso:
since its not a raft foundation it might not have any structural defect on it,the only issue here is that with time there will be capillary movement of water from the ground encroaching to the walls at the super structure where by leaving the walls damp .These is a major cause of flaking of paints at the lower part of buildings .It also gives room to insects and rodents to penetrate the ground floor of buildings that has no German floor. though I tried persuade him to do German floor even if its not more than 3 inches thickness he refused .Gave me instances of houses his friends and relations have built without German floor.
How many pillars on this building and the number of blocks used for the foundation please.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 2:38pm On Jul 06, 2017
Babs612000:

How many pillars on this building and the number of blocks used for the foundation please.
10 columns ,we used about 1200 blocks for the foundation

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 2:42pm On Jul 06, 2017
yak:
can u mention the quantity of materials used so far for the foundation. block, cement, gravel and more
35 bags of cement were used for the foundation,1200 blocks ,10 tonnes of gravel and 10 tonnes of sand .

2 Likes

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 3:18pm On Jul 06, 2017
tevanso:
35 bags of cement were used for the foundation,1200 blocks ,10 tonnes of gravel and 10 tonnes of sand .

Wow!!! Good work many thanks.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:17pm On Jul 10, 2017
work continues after several days of non stop rain

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:22pm On Jul 10, 2017
more pix

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:28pm On Jul 10, 2017
,

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:29pm On Jul 10, 2017
.

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 11:16pm On Jul 10, 2017
am always present. I have been waiting for update

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 11:46pm On Jul 10, 2017
yak:
am always present. I have been waiting for update

Me too.

I enjoy this stage of the building process.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 12:56pm On Jul 11, 2017
EgunMogaji:


Me too.

I enjoy this stage of the building process.

Have you done the filling if so how many tippers did you used and the cost per one in Ibadan please.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 12:59pm On Jul 11, 2017
Babs612000:


Have you done the filling if so how many tippers did you used and the cost per one in Ibadan please.

I used over 300 tons of laterite on my site. But OP should use way less.

I think I was paying N17K per 20 ton.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 1:56pm On Jul 11, 2017
EgunMogaji:


I used over 300 tons of laterite on my site. But OP should use way less.

I think I was paying N17K per 20 ton.
Many thanks.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 4:15pm On Jul 11, 2017
tevanso:
35 bags of cement were used for the foundation,1200 blocks ,10 tonnes of gravel and 10 tonnes of sand .

u mean 1200 blocks was all u used for the two flats?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 6:37pm On Jul 11, 2017
yak:


u mean 1200 blocks was all u used for the two flats?
yes,some area only required just 3 courses of blocks

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by klark3: 7:32pm On Jul 11, 2017
tevanso:
35 bags of cement were used for the foundation,1200 blocks ,10 tonnes of gravel and 10 tonnes of sand .
u mean u used 10 tonnes of sand for this foundation?
Including footing, blocksetting & concrete for columns?
i doubt.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by klark3: 7:35pm On Jul 11, 2017
tevanso:
since its not a raft foundation it might not have any structural defect on it,the only issue here is that with time there will be capillary movement of water from the ground encroaching to the walls at the super structure where by leaving the walls damp .These is a major cause of flaking of paints at the lower part of buildings .It also gives room to insects and rodents to penetrate the ground floor of buildings that has no German floor. though I tried persuade him to do German floor even if its not more than 3 inches thickness he refused .Gave me instances of houses his friends and relations have built without German floor.
My brother i perfectly understand the situation.
Many of these clients are difficult to convince when it comes to money.
Especially this german floor, many of them always avoid it.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 7:36pm On Jul 11, 2017
klark3:
u mean u used 10 tonnes of sand for this foundation? Including footing, blocksetting & concrete for columns? i doubt.
some sand and gravel were available on site.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by klark3: 7:37pm On Jul 11, 2017
tevanso:
some sand and gravel were available on site.
Okay sir
because i did two flat of two bedrooms, only the footing swallowed almost ten tonnes.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 7:41pm On Jul 11, 2017
Babs612000:


Have you done the filling if so how many tippers did you used and the cost per one in Ibadan please.
yes we have done the filing, we did some digging inside the plot to fill the building,and we also bought 20 tonnes of fillings too

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by klark3: 7:41pm On Jul 11, 2017
tevanso:
10 columns ,we used about 1200 blocks for the foundation
10 columns. are u proposing parapet for this build?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:18pm On Jul 11, 2017
klark3:
10 columns. are u proposing parapet for this build?
no parapet Sir

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:19pm On Jul 11, 2017
.

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by klark3: 9:03pm On Jul 11, 2017
tevanso:
no parapet Sir
d thing many ooo... cheesy
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by princeifynicky(m): 9:59pm On Jul 11, 2017
Good work so far... congrats Bro. More jobs, more opportunities, more blessings.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 10:35pm On Jul 11, 2017
klark3:

d thing many ooo... cheesy

10 is not too much l have 19 on mine including the court yard.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 10:38pm On Jul 11, 2017
how prices of building materials just hang up there!!!! tot with the new exchange rate, cement and other things wld have come down a bit

1 Like

(1) (2) (3) (4) (5) (6) (Reply)

Frequently Asked Question About Stone Coated Roofing Tiles / Best Place To Live In Lagos? Need Your Opinion(abroad 27yrs) / Buying Land In Ikorodu

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)