Construction Of A Twin 2 Bedroom Bungalow In Ibadan - Properties (4) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of A Twin 2 Bedroom Bungalow In Ibadan (11563 Views)

Construction Of A Twin 4bd/rm Duplex @IBADAN By Dioritestructures / Building A Twin 2 Bedroom Flat / Invest Your Money Wisely 12 Room And 2 Twin 2 Bedroom For Sale In Ibadan (images (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 9:09pm On Jul 17, 2017
yak:
I asked a question about material use especially block and cement. plz update. thanks
we have bought 3500 blocks so far and 100 bags of cement, 30 wood

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 9:27pm On Jul 17, 2017
If at beginning of a building you skipped German floor due to cash constraints, what can you do to remedy the consequences you talked about when you are now financially buoyant, just before flooring and completing the house?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 9:48pm On Jul 17, 2017
tevanso:
we have bought 3500 blocks so far and 100 bags of cement, 30 wood

thanks for the update.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 12:12am On Jul 18, 2017
tevanso:
financial constraints u said.
The owner is trying to economise his resources.

And there's nothing wrong with that as long as there's no structural shortcut.

This is where you come in grin
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by johnson232: 5:16am On Jul 18, 2017
tevanso:
meanwhile, where is the location of ur land
Edo state sir
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 5:37am On Jul 18, 2017
valacious:
If at beginning of a building you skipped German floor due to cash constraints, what can you do to remedy the consequences you talked about when you are now financially buoyant, just before flooring and completing the house?
You can cast 3-4" of concrete immediately after the foundation blocks this will prevent moisture rising called damp or effect of water rising from the ground,can also prevent insects from coming from the ground to the roof.

2 Likes

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 7:16am On Jul 18, 2017
Babs612000:

You can cast 3-4" of concrete immediately after the foundation blocks this will prevent moisture rising called damp or effect of water rising from the ground,can also prevent insects from coming from the ground to the roof.
Enlightening, thanks..
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 8:48am On Jul 18, 2017
valacious:
If at beginning of a building you skipped German floor due to cash constraints, what can you do to remedy the consequences you talked about when you are now financially buoyant, just before flooring and completing the house?

our oga, please consider this question too.
is there any way out?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 10:51am On Jul 18, 2017
valacious:
If at beginning of a building you skipped German floor due to cash constraints, what can you do to remedy the consequences you talked about when you are now financially buoyant, just before flooring and completing the house?
what u need to do is to break the lower part of the block so that the concrete can enter inside the block to cover up the void and make the thickness of the concrete at least 4inches .I think u will understand what i am trying to explain.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 10:53am On Jul 18, 2017
johnson232:
Edo state sir
aiit Edo state has a very solid land .Red sand majorly
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 11:06am On Jul 18, 2017
Babs612000:

You can cast 3-4" of concrete immediately after the foundation blocks this will prevent moisture rising called damp or effect of water rising from the ground,can also prevent insects from coming from the ground to the roof.

Isn't this assuming that the walls haven't been raised yet?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 11:07am On Jul 18, 2017
tevanso:
what u need to do is to break the lower part of the block so that the concrete can enter inside the block to cover up the void and make the thickness of the concrete at least 4inches .I think u will understand what i am trying to explain.

Won't this be compromising the credibility of the wall?

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by arcahmad(m): 11:08am On Jul 18, 2017
nice project! Following...
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by johnson232: 12:25pm On Jul 18, 2017
tevanso:
aiit Edo state has a very solid land .Red sand majorly
Very true
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 3:06pm On Jul 18, 2017
EgunMogaji:


Isn't this assuming that the walls haven't been raised yet?
Yes you are right.
I just got his question now that the walls has been raised.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 5:13pm On Jul 18, 2017
EgunMogaji:


Won't this be compromising the credibility of the wall?
the breaking will be on one layer of the block,which will be filled up with concrete.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 1:37am On Jul 19, 2017
[quote author=tevanso post=58587137]the breaking will be on one layer of the block,which will be filled up with concrete.


Can you please share some pictures of this if you have because l've never see something like that in mine life.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 7:23am On Jul 19, 2017
[quote author=Babs612000 post=58600244][/quote]I don't have the pix but I have done something of such before

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 9:07am On Jul 19, 2017
tevanso:
I don't have the pix but I have done something of such before
Ok many thanks.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Babs612000(m): 6:27pm On Jul 21, 2017
folmus:


@Babs12000, you are not updating us with your project o.!!! grin grin grin

Updated now.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 3:37pm On Jul 22, 2017
being busy lately I have being unable to update with pictures. we are through with the lintel and at level block now

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 3:58pm On Jul 22, 2017
.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 4:16pm On Jul 22, 2017
tevanso:
being busy lately I have being unable to update with pictures. we are through with the lintel and at level block now

good to hear. hope rain isn't disturbing ur progress.
later u update on material use as usual

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 12:46am On Jul 23, 2017
johnson232:

Seems there are alot of financial constraint on this project...

Egunmogaji would always say no award for finishing quick. building project shld b worked at ones pace.

1 Like

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by Nobody: 5:40am On Jul 23, 2017
yak:


Egunmogaji would always say no award for finishing quick. building project shld b worked at ones pace.

grin

Brabus used to say that here and it made sense to me.
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by genkins(m): 9:54am On Jul 27, 2017
@ tevanso..so far u are the only one on this forum that has come up with the best solution regarding how to remedy building a house without dpc so far.I hope its practicable cos I did not do dpc or DPM but have floored tho yet to tile.ur option would suggest I break the flooring,or better still increase my floor level by 4inches..am I right?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 7:39pm On Jul 27, 2017
genkins:
@ tevanso..so far u are the only one on this forum that has come up with the best solution regarding how to remedy building a house without dpc so far.I hope its practicable cos I did not do dpc or DPM but have floored tho yet to tile.ur option would suggest I break the flooring,or better still increase my floor level by 4inches..am I right?
break the interior part of the block so that the concrete u are going to cast can enter inside the block and block the hole .
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 7:40pm On Jul 27, 2017
.we are through with block work

Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by yak(m): 7:44pm On Jul 27, 2017
tevanso:
break the interior part of the block so that the concrete u are going to cast can enter inside the block and block the hole .


so, I can just use concrete to cover the block holes round and about. especially the external walls?
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by tevanso(m): 8:00pm On Jul 27, 2017
yak:



so, I can just use concrete to cover the block holes round and about. especially the external walls?
u can only do that for the interior walls meanwhile u have to block part of the holes with rubbles before casting to avoid waste of materials
Re: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by oduncojamaica(m): 10:27pm On Jul 27, 2017
@tevanso
Can you Pls show us some picture sir

(1) (2) (3) (4) (5) (6) (Reply)

Own A Tent For Your Event Center Business / Architectural Design Of A 4 Bedroom Duplex / Buying Land In Ikorodu

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.