New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 10:34pm On Jun 27, 2020 |
Hello great people, We are glad to bring to you a new project we are embarking upon for a Nairaland here. Project Location: Ekori, Cross River State. Project Title: 4 Bedroom ultra modern Duplex with outdoor swimming pool. Kindly follow up. We are commencing tomorrow with setting out. Our work team came down from Lagos and some from Port Harcourt to make this happen. It hasn't been an easy journey though. That's a story for another day with this inter state Lockdown problems. See 3D of the building below then follow us up on it. We Just Updated the Design after review with client. For more of our works. Go to www.facebook.com/dennis3ds or www.instagram.com/nwabuisidennis 1 Like
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by mufutau55(m): 10:54pm On Jun 27, 2020 |
Surely following. Hajji M. 2 Likes |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by flekky07(f): 1:30am On Jun 28, 2020 |
Following 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by topsy23(m): 3:29am On Jun 28, 2020 |
Lovely design Following. ....... 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 5:58am On Jun 28, 2020 |
Thank you all for following. Feel free to ask questions while we start pls. Comment. I like engaging audience in the building process. |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 9:32am On Jun 28, 2020 |
Materials arriving on site. Sand, Granite and other materials herein a shown in the picture. Our target is to get to decking and do it in 21 Days from tomorrow morning... June 29th. All though we would do the setting out today 28th June. Then rest coz we have been on the road for 2 days to get here. Digging commences tomorrow
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 9:32am On Jun 28, 2020 |
Borehole tap linked to site. Also attached is a screen shot of the construction document.
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 5:30pm On Jun 28, 2020 |
We commences setting out today as scheduled. We just move this way in any site we go on. The colors are brilliant. After reviewing with the team. We started what we do best. We would have dug today but we decided to rest a bit and resume fully tomorrow. Some cultural stuff exists here about digging foundation for an indigine. Interestingly, I have once experienced that in Uratta in Imo State 2018 when I went with my team too for a project. In all, it's all good and promises to be fun while work is still been done as it should. 2 Likes
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 6:12am On Jun 29, 2020 |
Site Updates on setting out
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Chekitaut: 3:15pm On Jun 29, 2020 |
weldone, congratulations on the new project. 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 3:16am On Jun 30, 2020 |
Day 1 - Officially We are on the move already... Setting out completed in a day with Digging and Blinding of the foundation. Welder works also 95% ready with columns and base.
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 3:20am On Jun 30, 2020 |
More picture updates. Foundation depth - 3fit Welder Works and Blinding all done same day. Details below...
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 11:18am On Jun 30, 2020 |
More updates coming up today 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Jumyg: 11:27am On Jun 30, 2020 |
Well done. Following. 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 1:02pm On Jun 30, 2020 |
Jumyg: Thanks for following through |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 12:36am On Jul 02, 2020 |
Work updates from today. We did the pillar base concrete works and commenced block forming on day 2. We formed blocks at 20% on this same day.
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 12:40am On Jul 02, 2020 |
Day 3 - July 1st. We did the block work forming by 95% Also the carpenter boarded the pillars in the 20% block work formed yesterday. Brick layers used here = 4 Labour used here = 8 to achieve this speed of works coz the nature of the blocks here is entirely different from the Hollow blocks you know. This ones are 100 heavier than the regular 9 inches known in Lagos. This is half Hollow and half solid as shown in the pictures below
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 3:17am On Jul 02, 2020 |
Stay tuned for Day 3 Updates. The columns for the ground floor to Decking is almost ready at this point in just day 3. |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by mufutau55(m): 3:41am On Jul 02, 2020 |
Dennis3D: Very nice work you are doing here, Boss. No time wasted at all. Keep up the good work. Hajji M. |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 6:46am On Jul 02, 2020 |
mufutau55: Thank you sir. Well appreciated. Keep following |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 8:43am On Jul 02, 2020 |
Day 3. Colum to Decking is getting set
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 10:55am On Jul 02, 2020 |
Keep following |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 12:23pm On Jul 02, 2020 |
... July 2nd 2020 Updates We have started back filling and preparing ground beam concrete work and reinforcement
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Ratun(m): 1:48pm On Jul 02, 2020 |
Your 3D is not showing the swimming pool. |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 7:40pm On Jul 02, 2020 |
Ratun: See it here I believe with time I will update the 3D with my recent software to improve some things
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 1:52am On Jul 03, 2020 |
.... |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 5:40am On Jul 03, 2020 |
Day 4. Back filling and construction of ground beam. Block works took about 900 pieces Height of 850 from the back then 1m in front to achieve the level.
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 12:56pm On Jul 03, 2020 |
... Work update still on day 4
|
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 1:31pm On Jul 03, 2020 |
... |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by diordaves(m): 1:42pm On Jul 03, 2020 |
Dennis3D: Nice job. Please throw more light on the choice of the foundation design. What's the soil condition like? Why the structural introduction of a ground beam? Given your knowledge of the soil condition, do you think there are alternative cost effective foundation designs without the ground beam? The blocks are really unique. Very effective and practical for hollow blocks. Well done. 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by jamalnation(m): 3:57pm On Jul 03, 2020 |
Following 1 Like |
Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(m): 6:39pm On Jul 03, 2020 |
diordaves: Thank you for your questions. The introduction of ground beam was as a result of historical background of the place. However, once it's ascertained that the land is good enough without ground movement and fast settlement, you may not need ground beam. Example of this was a two story we did in Uratta Owerri. There was no need for ground beam then because the soil was strong. The foundation still remains pad and strip. The only new thing is the beam. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (20) (Reply)
Sure and better deals...bend Down And Select!!! / Help: Please How Much Will It Cost Me? Sketch Picture Attached / Maryland Complex Under Construction Collapsed Yesterday In Lagos
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2025 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31 |