Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,193,005 members, 7,949,422 topics. Date: Sunday, 15 September 2024 at 09:31 AM |
Nairaland Forum / Nairaland / General / Politics / Omotosho Power Plant Ready For Commissioning (11340 Views)
Iara Oshiomhole At The Commissioning Of Uju Romi Ultra Modern Market (Pics) / President Jonathan Commissions 500MW Omotosho Power Plant / Anambra Oil Field Ready For Commissioning Next Month (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (Reply) (Go Down)
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 11:56pm On Mar 07, 2013 |
jmaine: No GEJ awraded and commissioned it in 2005 when he was washing wrapper for Alamco 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 11:59pm On Mar 07, 2013 |
Prof Corruption: The said Omotosho Phase two plant started in 2010 , so am wondering what OBJ and 2005 has to deal with it . . . Straw grasping identified . . . . . . Now take a bow bruv, your cynic attempt is hereby declared null and void . . . . 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by CyberG: 12:08am On Mar 08, 2013 |
Copy copy president retadeenho who cannot come up with his own ORIGINAL ideas and projects. 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by gramci: 12:11am On Mar 08, 2013 |
CyberG: Copy copy president retadeenho who cannot come up with his own ORIGINAL ideas and projects. See them, one by one them de show face. GEJ will surely put you all to shame. ENEMIES OF PROGRESS 4 Likes |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:15am On Mar 08, 2013 |
Eko Ile: Am not seeking to entertain you, i told you the truth which is clear in your face but you choosed to ignore it just like your types. 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by OldWizard1: 12:19am On Mar 08, 2013 |
Just vote for APC in 2015. |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:21am On Mar 08, 2013 |
karl max: he and his hypocrites have been trying hard to justify the lies that their master and liar mohammed has been selling to ignorant nigerians that gej is a failure. We are here to cull and quarantine all their hopeless venture . . . The innocent readers and observers must not get infected with their consistent falsehood . . . . 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:22am On Mar 08, 2013 |
Old Wizard: Just vote for APC in 2015. True |
Re: Omotosho Power Plant Ready For Commissioning by gramci: 12:24am On Mar 08, 2013 |
Where are the E-witches and wizards . It seems their time is up 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:25am On Mar 08, 2013 |
jmaine: Arrant nonsense! Yar'Adua stalled projects, GEJ said we can now continue with OBJ projects. What's difference between six and half a dozen? |
Re: Omotosho Power Plant Ready For Commissioning by gramci: 12:25am On Mar 08, 2013 |
Old Wizard: Just vote for APC in 2015. See this old wizard 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:26am On Mar 08, 2013 |
Old Wizard: Just vote for APC in 2015. Or what ? Get blown and killed with the accumulated cache of weapons from the likes Hussaini Dei Dei and other CPC/APC desperate northerners . . . . 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:29am On Mar 08, 2013 |
Prof Corruption: Quit been a recalcitrant dolt and stop wasting our time . . . . Who signed the contract to signal the inception of this current power project ? . . Answer that question and shame your fans . . . . 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by OldWizard1: 12:29am On Mar 08, 2013 |
gramci: I have had enough of GEJ's incompetence. Security, zero. Infrastructure, Zero. Corruption, 100%, We can do better than this. I am not interested in all these argument here and there. Just vote for APC. Forget PDP, they would promise everything but do nothing. |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:31am On Mar 08, 2013 |
Old Wizard: Yes, do nothing like this completed 500MW power project . . . Kudos dude, i like your spirit . . . . 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by Obiora4life: 12:31am On Mar 08, 2013 |
Old Wizard: Give us a good reason to vote APC because what we're seeing now ain't it. 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by theripper: 12:32am On Mar 08, 2013 |
When I said 0AMJ419 was a fraud, y'all thot I was joking abi? He and his cohorts probably had premature ej»acu:lati“on when Fashola commissioned the first street light in "Nigeria" but is quick to discredit at least a panegyric project by the FG under Pres Jo. Una dey see the life of all dis Mushin and Oshodi touts now? 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:35am On Mar 08, 2013 |
jmaine: Who conceptualised and initiated Omotoso Power Plant project. Certainly not GEJ Who envisioned the projects in different phases Certainly not GEJ. Who brought Chinese investors and contractors alike to invest in the project, certainly not GEJ Who commissioned a spectacular part of the project in 2007, certainly not GEJ Who initiated about 11 power projects now coming on stream, certainly not GEJ I laughed real hard on how a failure is being packed to look like a success. Who are you freaking deceiving? 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by gramci: 12:36am On Mar 08, 2013 |
the_ripper: When I said 0AMJ419 was a fraud, y'all thot I was joking abi? He and his cohorts probably had premature ej»acu:lati“on when Fashola commissioned the first street light in "Nigeria" but is quick to discredit at least a panegyric project by the FG under Pres Jo. Una dey see the life of all dis Mushin and Oshodi touts now? Confirmed scam 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by Ikology(m): 12:36am On Mar 08, 2013 |
Prof Corruption:wonders, hmm No amount of hatred will affect GEJ. God is with him. do not forget KARMA 2 Likes |
Re: Omotosho Power Plant Ready For Commissioning by OldWizard1: 12:38am On Mar 08, 2013 |
jmaine: Kudos for completing 500MW. But in how many years? We should be waiting for another 12 years before PDP commissions another 500MW? Is that what you want? Well if someone needs a billion naira but given one naira, it's more or less nothing. |
Re: Omotosho Power Plant Ready For Commissioning by Obiora4life: 12:39am On Mar 08, 2013 |
I wonder why some people cannot say THANK YOU GEJ for this one YET keep your criticism for the one he jacks up. 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:41am On Mar 08, 2013 |
Old Wizard: They are failures. |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:42am On Mar 08, 2013 |
Obiora4life: I wonder why some people cannot say THANK YOU GEJ for this one YET keep your criticism for the one he jacks up. For being a failure? |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:43am On Mar 08, 2013 |
Ikology: wonders, hmm No amount of hatred will affect GEJ. God is with him. do not forget KARMA What hatred? He is fraudulently claiming credit for what is not his and you are talking of hatred? |
Re: Omotosho Power Plant Ready For Commissioning by gramci: 12:45am On Mar 08, 2013 |
Prof Corruption: Shame on you 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:48am On Mar 08, 2013 |
gramci: I would rather you said shame on GEJ |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:50am On Mar 08, 2013 |
Prof Corruption: A macabre dance to no where . .This thread is about the commissioning of the 500MW Omotosho phase two plant . . and i simply ask you a simple question below . . . . jmaine: Can you please answer the above and quit your childish straw grasping . . . 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by jmaine: 12:52am On Mar 08, 2013 |
Old Wizard: The current feat took barely 3 years, so where is your 12 years coming from . . . . 1 Like |
Re: Omotosho Power Plant Ready For Commissioning by EkoIle1: 12:53am On Mar 08, 2013 |
CyberG: Copy copy president retadeenho who cannot come up with his own ORIGINAL ideas and projects. EL Retardeen came up with the great cassava bread idea. lmao |
Re: Omotosho Power Plant Ready For Commissioning by EkoIle1: 12:54am On Mar 08, 2013 |
Prof Corruption: That one is a dullard like hos aso rock drunken dullard.. |
Re: Omotosho Power Plant Ready For Commissioning by Nobody: 12:54am On Mar 08, 2013 |
jmaine: Not only a macabre dance! Who conceptualised and initiated Omotoso Power Plant project? Who envisioned the projects in different phases ? Who brought Chinese investors and contractors alike to invest in the project? Who commissioned a spectacular part of the project in 2007? Who initiated about 11 power projects now coming on stream? The last one, who deserves credit for the Omotoso power plant? |
(1) (2) (3) (4) (5) (6) (7) (8) (Reply)
Court Reinstate Obio/akpor Council Chairman / Polytechnics Vs University Students Top Debate – HND Better Than B.sc 2nd Class / Pastor Nsikanabasi Ese Accuses Ephraim Inyang Of Embezzling N200m Christmas Fund
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38 |